Tie-down Vector Dynamics Foundation System for Wind Zones I Bedienungsanleitung Seite 18

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 19
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 17
Page18 4/3/2013
Asphalt Installation
TheseAsphaltinstructionsareanaddendumtothestandardVectorDynamicsconcreteinstructions.Readand
follow all applicable guidelines in the instructions for Vector, the home, office, classroom or portable building
being installed. Minimum depth of asphalt is 2 inches with a suitable base material compacted under the
asphalt. This system is designed for portable classrooms, offices or other structures using I-beam frames.
NOTE-ForMultipleunitsets,alwaysinstallbyunitastheyareplaced.
1. TheasphaltkitisusedincombinationwiththeVectorconcretekits59036and59049.Theexpansionbolts
providedinthesekitsarenotused.Assembletheasphaltbracketasshowningure1,usingthecarriage
boltsandhexnutsprovided.Theboltheadswillbeontheunderside(at)oftheVectorpad.TheAsphalt
bracketwillbepositionedbetweentheVectorpadandthetensionbracket.Repeatforthesecondpad.
2. Determine the location of the piers and place assembled pad on asphalt. Center pad under beam with
upturned edge facing the Inside. Place second pad under opposite beam, parallel with first pad. Stack
concrete blocks against up turned lip on pads and finish and wedge pier.
3. Usingtheasphaltbracketsasaguide,drillthree5/8”holesintheasphaltata45degreeangleunderpier.
Usingasledgehammerorhammerdrill,driverodssuppliedthroughthebracketandintotheasphalt,
leavingoneinchofrodabovebracket.Repeatforoppositepad(seegure2).
4. Measure distance between the two Vector System pads at the base where the Vector pad meets the asphalt.
Cuttwogroundtreated2x4’sora4x4tolengthandplacebetweenpiersasshown.PlacealongU-bolt
underthe2x4’sandthroughtheholesintheupturnededgeoftheVectorPad.Beforesecuringwiththe3/8”
nutsprovided,placea1/2”x1”carriageboltprovidedinthesquareholeintheupturnededgeoftheVector
pad. The carriage bolt will be installed with the head of the bolt under the upturned edge with the
threads showing.
5.Attachastrapwithswivelstrapconnectortothe1/2”carriagebolt.Securewith1/2”nut.Strapshouldbe
ofsufcientlengthtogoovertheoppositeI-beamanddowntothetensionbracketwith12”-15”extrato
wrap around the slotted bolt. (See figure 2).
6.Insertslottedboltintensionbracket,andcutstrapsothereisapprox.12”-15”ofstrapoverlap.Insertinslot
ontheboltsothatitisushwithothersideofbolt.Tightenstrapontoboltsothereare4-5turnsofstrap
around the bolt and repeat for other side.
Figure 1
Figure 2
Seitenansicht 17
1 2 ... 13 14 15 16 17 18 19

Kommentare zu diesen Handbüchern

Keine Kommentare